Platform recovery sprint

Platform Recovery Sprint

Optional offer. A separate assessment booking is not required for engineering support.

Another analysis to file away — A fixed-scope engagement for teams whose path to production no longer holds.

Four fixed-scope weeks to get your delivery back into a state your own team can hold. It ends with merged changes in your repositories and a service running on them — not with recommendations.

The recovery sprint is deliberately not an assessment. An assessment ends with analysis, a prioritized list and a roadmap. The sprint ends with changes in your systems. If all that is left afterwards is documents, it failed — and that is the bar we accept being judged by.

Duration and scope

Duration
4 weeks with a fixed start and end date. Inside them sit 12 days of our time, spread across three days a week. The rest of the time belongs to your team: they decide, review and merge. Without that time the sprint does not work.
Scope
The sprint is anchored to exactly one reference service from your production estate, named before day one. Everything we build is built against it and can be carried to further services afterwards. Three results are always included — baselines, ownership, one golden path. On top of those you pick 2 more focus tracks from the three available at scoping. The third is deliberately left out: four weeks do not carry it at a depth worth paying for.

When the sprint is the right step

  • A release took production down and nobody can reconstruct which change did it.
  • Deployments have become an event: they need a slot, an approval, and someone willing to press the button.
  • The pipeline is slow and unreliable, and people re-run it until it goes green.
  • The person who held the platform in their head has left. What they owned is written down nowhere.
  • An assessment or an internal review named the problems long ago — a quarter later, none of it has been implemented.
  • Kubernetes is running but operations are not: no runbooks, alerts nobody trusts, and a lot still done by hand.
  • New joiners take weeks to get their first change into production, because there is no paved road.

When it is not

  • You do not yet know what is actually wrong. An analysis is the more honest first step — the sprint implements, it does not investigate.
  • You are in an active outage. A sprint with a fixed start date does not help you today; call anyway and we will tell you who you need.
  • You do not have a platform yet and want one built. That is a build engagement on a different timescale, not a sprint.
  • You are looking for someone to run operations permanently. We hand over at the end — that is the whole point.
  • Nobody on your team can work alongside us during those four weeks. Then the result stays with us instead of with you, and the sprint has missed its purpose.

The six outcome tracks

always included

Establish platform baselines

What "healthy" means gets measured rather than asserted: deployment frequency, lead time for a change, change failure rate and time to restore — taken from your own systems, using a method you can repeat without us.

always included

Clarify ownership

Every platform component gets a named owner and an escalation path. Not as an org chart, but as a list the named people have agreed to.

always included

Introduce one golden path

A paved road from repository to production — for exactly one service, but complete: project scaffold, pipeline, deployment, observability, alerting. Reusable afterwards, but proven on a real example first.

selectable

Stabilize deployments

Selectable focus: reproducible builds, a defined rollback path that has been triggered at least once, and deployments that no longer need special permission.

selectable

Remove CI/CD bottlenecks

Selectable focus: the pipeline gets faster and, more importantly, trustworthy — flaky tests fixed or switched off, caching and parallelism where they actually pay, and a green run that means something again.

selectable

Reduce operational toil

Selectable focus: the recurring manual steps that cost time every week get automated or abolished — and the alerts nobody reads any more get sharpened or deleted.

The four weeks

  1. Week 1

    Measure and fix the scope: access, baseline measurement from your systems, ownership written down, reference service confirmed, sprint backlog frozen. From the end of this week the scope does not grow.

  2. Week 2

    The first selected focus: we work on the path a change takes to production today — in pull requests, with your team, not in a side project.

  3. Week 3

    The golden path: by the end of the week the reference service runs entirely through the new path — at minimum into the last environment before production.

  4. Week 4

    The second selected focus, runbooks, the repeat baseline measurement and the handover. On the final day someone from your team deploys while we are not in the room.

What you have at the end

  • measurement

    A measured delivery baseline — taken from your systems, repeated at the end with the same method, both figures in the handover document.

  • merged change

    Merged changes to your pipeline and deployment configuration, in your repositories, through pull requests your team reviewed.

  • running system

    The reference service runs through the new path — in production, or in the last environment before it, depending on what you can release within four weeks.

  • merged change

    A reusable golden-path template: project scaffold, pipeline and deployment manifests a second service can adopt to take the same route.

  • document

    An ownership map: every platform component with a named person and an escalation path, confirmed by exactly those people.

  • document

    Runbooks for the incidents that actually hit you — written during the sprint and rehearsed at least once during it.

  • merged change

    The recurring manual steps in the selected focus are automated or abolished, not merely documented.

  • document

    A handover session with your team and a written remaining backlog: what we did not do, why, and in what order it would make sense to.

How this differs from an analysis

The analysis is not published as a separate offer yet. The left column describes what an analysis delivers, so you can tell whether you need that or the sprint.

AnalysisRecovery sprint
An analysis of the bottlenecks, from interviews and system access.A measured baseline from your systems, taken again at the end.
A prioritized list of quick improvements.The improvements are implemented and merged, not listed.
A recommendation for what the target state should look like.One service runs in that target state, on a real example.
An architecture review with findings.A template that makes the reviewed path repeatable for further services.
A risk and dependency map.An ownership map the named people have agreed to.
A review of the delivery flow.Runbooks that were rehearsed once during the sprint.
A roadmap for the coming months.A remaining backlog of what is still open after four weeks — with the reasoning.

When the sprint is finished

  • Someone from your team has deployed the reference service through the new path, at least once, without us in the room.
  • The baseline has been measured again with the same method as in week 1, and both figures are in the handover document — whatever they show.
  • Every component in the ownership map has a person who has confirmed the assignment.
  • Every runbook written during the sprint has been executed once by someone from your team.
  • The remaining backlog is written down, prioritized, and has a named owner per entry.
  • Our access can be revoked on the final day without anything we built ceasing to work.

What we need from you

  • One counterpart with decision authority, reachable throughout the four weeks.
  • Access in week one: repositories, CI, cluster or runtime, observability. Granted later, the sprint gets shorter — it does not get extended.
  • The reference service, named before day one.
  • Roughly one day a week per involved team member, for reviews, decisions and working alongside us.
  • Permission to deliver to the main branch through pull requests, and a non-production environment we are allowed to work in.

Price

A fixed price for a fixed scope, not a day rate: a sprint billed by time spent no longer has a fixed scope. We do not publish a price list — the price comes with the proposal, together with the scope, before you commit to anything.

What comes next

Afterwards there are three honest options: you carry on alone — the normal case, and the purpose of the handover; you extend the golden path to further services and we accompany the first few; or you bring in interim technical leadership. None of these is part of the sprint, and none of them is a precondition for it working.

Plainly: there are no before-and-after figures from earlier sprints on this page. The offer is newly scoped, and numbers from earlier engagements were never captured in a way that would prove anything here. What we have built and cleaned up is in the references — without metrics, because we did not measure them.

Contact

Is your delivery stuck?

Tell us in a few sentences what went wrong most recently. We will also say so if a sprint is the wrong instrument.